JOB-0030Vääksy Energia Oy
Customer CUS-030 · Completed · opened 29.03.2025 at 01:02 · completed 20.05.2025 at 01:02
Work centres: CNC-1, CNC-2, WELD-1
No blocking findings: the margin is reportable.
Quote basis and actual
| Item | Quote basis | Actual |
|---|---|---|
| Revenue (allocated) | 4 455,03 € | 4 455,03 € |
| Material | 1 706,74 € | 1 606,82 € |
| Labour | 22,08 h × 57,98 €/h | 1 229,18 € |
| Subcontract | 0,00 € | 0,00 € |
| Other variable costs | 58,20 € | 58,20 € |
| Margin | — | 1 560,83 € |
The estimated margin is not a stored figure: the quote basis stores the items, and the bridge sets out the difference between estimated and actual line by line.
Snapshot computed 21.09.2026 at 14:48 · definition job-margin/2026-09-20.1 · inputs 3845465fed6b
The margin bridge
The bridge explains the arithmetic difference: each line says how much of the gap between the estimated and the actual margin that driver accounts for. It does not establish a cause. Why a price or an hours figure moved is a different question, and this view does not answer it.
- 1Revenue differencerevenue_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 2Material quantity differencematerial_quantity_varianceCausal+55,89 €
Evidence (11 rows · Causal reference: 11)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000254 1 20.04.2025 at 11:33 synthetic/v1 In order qty Material consumption material_consumption erp MC-000255 1 19.04.2025 at 01:26 synthetic/v1 In order qty Material consumption material_consumption erp MC-000256 1 17.04.2025 at 10:49 synthetic/v1 In order qty Material consumption material_consumption erp MC-000257 1 18.04.2025 at 22:47 synthetic/v1 In order qty Material consumption material_consumption erp MC-000258 1 02.04.2025 at 07:32 synthetic/v1 In order qty Material consumption material_consumption erp MC-000259 1 30.03.2025 at 15:53 synthetic/v1 In order qty Material consumption material_consumption erp MC-000260 1 30.04.2025 at 16:50 synthetic/v1 In order qty Material consumption material_consumption erp MC-000261 1 11.05.2025 at 20:01 synthetic/v1 In order qty Material consumption material_consumption erp MC-000262 1 13.05.2025 at 09:34 synthetic/v1 In order qty Material consumption material_consumption erp MC-000263 1 29.04.2025 at 15:19 synthetic/v1 In order qty Material consumption material_consumption erp MC-000264 1 24.04.2025 at 08:30 synthetic/v1 In order qty - 3Material price differencematerial_price_varianceCausal+44,03 €
Evidence (11 rows · Causal reference: 11)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000254 1 20.04.2025 at 11:33 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000255 1 19.04.2025 at 01:26 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000256 1 17.04.2025 at 10:49 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000257 1 18.04.2025 at 22:47 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000258 1 02.04.2025 at 07:32 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000259 1 30.03.2025 at 15:53 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000260 1 30.04.2025 at 16:50 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000261 1 11.05.2025 at 20:01 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000262 1 13.05.2025 at 09:34 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000263 1 29.04.2025 at 15:19 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000264 1 24.04.2025 at 08:30 synthetic/v1 In order unitCost - 4Labour hours differencelabour_hours_varianceCausal+51,02 €
Evidence (15 rows · Causal reference: 15)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-000432 1 20.04.2025 at 04:28 synthetic/v1 In order hours Time entry time_entry timeclock TE-000433 1 25.04.2025 at 20:17 synthetic/v1 In order hours Time entry time_entry timeclock TE-000434 1 18.04.2025 at 00:12 synthetic/v1 In order hours Time entry time_entry timeclock TE-000435 1 01.05.2025 at 12:31 synthetic/v1 In order hours Time entry time_entry timeclock TE-000436 1 17.05.2025 at 23:07 synthetic/v1 In order hours Time entry time_entry timeclock TE-000437 1 13.04.2025 at 07:55 synthetic/v1 In order hours Time entry time_entry timeclock TE-000438 1 30.03.2025 at 04:20 synthetic/v1 In order hours Time entry time_entry timeclock TE-000439 1 20.04.2025 at 19:57 synthetic/v1 In order hours Time entry time_entry timeclock TE-000440 1 15.05.2025 at 20:44 synthetic/v1 In order hours Time entry time_entry timeclock TE-000441 1 11.04.2025 at 19:29 synthetic/v1 In order hours Time entry time_entry timeclock TE-000442 1 01.04.2025 at 22:13 synthetic/v1 In order hours Time entry time_entry timeclock TE-000443 1 10.04.2025 at 09:17 synthetic/v1 In order hours Time entry time_entry timeclock TE-000444 1 11.04.2025 at 09:17 synthetic/v1 In order hours Time entry time_entry timeclock TE-000445 1 20.04.2025 at 12:30 synthetic/v1 In order hours Time entry time_entry timeclock TE-000446 1 21.04.2025 at 23:23 synthetic/v1 In order hours - 5Labour rate differencelabour_rate_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 6Subcontract differencesubcontract_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 7Rework differencerework_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 8Other variable cost differenceother_variable_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 9Unexplained differenceresidual_unexplainedNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- ReconcilesJOB-0030 reconciles: the drivers account for the whole of the difference between the estimated and the actual margin (residual 0,00 €, tolerance 50,00 €)
The stored note
tolerance 5000 minor units; tasmaa: JOB-0030 reconciles: the drivers account for the whole of the difference between the estimated and the actual margin (residual 0,00 €, tolerance 50,00 €)
The bridge is computed from the stored snapshot. The next step is always the same: open the line's evidence and check the source rows.
Findings (1)Margin 1 560,83 € · 35,04 %
- Medium mediumUnallocated labourR4470,23 €
Labour attributed to JOB-0030 by its operation carries no job allocation: 470,23 € at the posted rates.
The job is in order · work centres CNC-1, CNC-2, WELD-1 · version job-margin-rules/2026-09-20.1 · computed 21.09.2026 at 14:48
Evidence (3 rows · Causal reference: 3)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-900046 1 18.04.2025 at 00:20 synthetic/v1 In order hours Time entry time_entry timeclock TE-900047 1 25.04.2025 at 12:25 synthetic/v1 In order hours Time entry time_entry timeclock TE-900048 1 23.04.2025 at 09:12 synthetic/v1 In order hours