JOB-0062Kaskinen Energia Oy
Customer CUS-022 · Completed · opened 07.10.2025 at 16:58 · completed 16.10.2025 at 16:58
Work centres: CNC-1, CNC-2, WELD-1
No blocking findings: the margin is reportable.
Quote basis and actual
| Item | Quote basis | Actual |
|---|---|---|
| Revenue (allocated) | 33 319,05 € | 33 319,05 € |
| Material | 11 773,34 € | 14 859,58 € |
| Labour | 116,44 h × 70,78 €/h | 7 334,94 € |
| Subcontract | 0,00 € | 0,00 € |
| Other variable costs | 678,14 € | 678,14 € |
| Margin | — | 10 446,39 € |
The estimated margin is not a stored figure: the quote basis stores the items, and the bridge sets out the difference between estimated and actual line by line.
Snapshot computed 21.09.2026 at 14:48 · definition job-margin/2026-09-20.1 · inputs 932f73869ad0
The margin bridge
The bridge explains the arithmetic difference: each line says how much of the gap between the estimated and the actual margin that driver accounts for. It does not establish a cause. Why a price or an hours figure moved is a different question, and this view does not answer it.
- 1Revenue differencerevenue_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 2Material quantity differencematerial_quantity_varianceCausal−226,28 €
Evidence (7 rows · Causal reference: 7)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000511 1 14.10.2025 at 21:02 synthetic/v1 In order qty Material consumption material_consumption erp MC-000512 1 12.10.2025 at 11:11 synthetic/v1 In order qty Material consumption material_consumption erp MC-000513 1 09.10.2025 at 15:58 synthetic/v1 In order qty Material consumption material_consumption erp MC-000514 1 15.10.2025 at 21:48 synthetic/v1 In order qty Material consumption material_consumption erp MC-000515 1 11.10.2025 at 08:01 synthetic/v1 In order qty Material consumption material_consumption erp MC-000516 1 11.10.2025 at 18:22 synthetic/v1 In order qty Material consumption material_consumption erp MC-000517 1 09.10.2025 at 09:10 synthetic/v1 In order qty - 3Material price differencematerial_price_varianceCausal−2 859,96 €
Evidence (7 rows · Causal reference: 7)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000511 1 14.10.2025 at 21:02 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000512 1 12.10.2025 at 11:11 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000513 1 09.10.2025 at 15:58 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000514 1 15.10.2025 at 21:48 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000515 1 11.10.2025 at 08:01 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000516 1 11.10.2025 at 18:22 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000517 1 09.10.2025 at 09:10 synthetic/v1 In order unitCost - 4Labour hours differencelabour_hours_varianceCausal+906,69 €
Evidence (13 rows · Causal reference: 13)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-000916 1 10.10.2025 at 07:17 synthetic/v1 In order hours Time entry time_entry timeclock TE-000917 1 12.10.2025 at 22:07 synthetic/v1 In order hours Time entry time_entry timeclock TE-000918 1 13.10.2025 at 22:11 synthetic/v1 In order hours Time entry time_entry timeclock TE-000919 1 07.10.2025 at 18:26 synthetic/v1 In order hours Time entry time_entry timeclock TE-000920 1 16.10.2025 at 10:57 synthetic/v1 In order hours Time entry time_entry timeclock TE-000921 1 12.10.2025 at 21:14 synthetic/v1 In order hours Time entry time_entry timeclock TE-000922 1 13.10.2025 at 11:44 synthetic/v1 In order hours Time entry time_entry timeclock TE-000923 1 08.10.2025 at 16:03 synthetic/v1 In order hours Time entry time_entry timeclock TE-000924 1 11.10.2025 at 08:20 synthetic/v1 In order hours Time entry time_entry timeclock TE-000925 1 11.10.2025 at 18:22 synthetic/v1 In order hours Time entry time_entry timeclock TE-000926 1 09.10.2025 at 23:06 synthetic/v1 In order hours Time entry time_entry timeclock TE-000927 1 15.10.2025 at 21:18 synthetic/v1 In order hours Time entry time_entry timeclock TE-000928 1 09.10.2025 at 05:14 synthetic/v1 In order hours - 5Labour rate differencelabour_rate_varianceCausal−0,01 €
Evidence (13 rows · Causal reference: 13)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-000916 1 10.10.2025 at 07:17 synthetic/v1 In order rate Time entry time_entry timeclock TE-000917 1 12.10.2025 at 22:07 synthetic/v1 In order rate Time entry time_entry timeclock TE-000918 1 13.10.2025 at 22:11 synthetic/v1 In order rate Time entry time_entry timeclock TE-000919 1 07.10.2025 at 18:26 synthetic/v1 In order rate Time entry time_entry timeclock TE-000920 1 16.10.2025 at 10:57 synthetic/v1 In order rate Time entry time_entry timeclock TE-000921 1 12.10.2025 at 21:14 synthetic/v1 In order rate Time entry time_entry timeclock TE-000922 1 13.10.2025 at 11:44 synthetic/v1 In order rate Time entry time_entry timeclock TE-000923 1 08.10.2025 at 16:03 synthetic/v1 In order rate Time entry time_entry timeclock TE-000924 1 11.10.2025 at 08:20 synthetic/v1 In order rate Time entry time_entry timeclock TE-000925 1 11.10.2025 at 18:22 synthetic/v1 In order rate Time entry time_entry timeclock TE-000926 1 09.10.2025 at 23:06 synthetic/v1 In order rate Time entry time_entry timeclock TE-000927 1 15.10.2025 at 21:18 synthetic/v1 In order rate Time entry time_entry timeclock TE-000928 1 09.10.2025 at 05:14 synthetic/v1 In order rate - 6Subcontract differencesubcontract_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 7Rework differencerework_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 8Other variable cost differenceother_variable_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 9Unexplained differenceresidual_unexplainedNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- ReconcilesJOB-0062 reconciles: the drivers account for the whole of the difference between the estimated and the actual margin (residual 0,00 €, tolerance 166,60 €)
The stored note
tolerance 16660 minor units; tasmaa: JOB-0062 reconciles: the drivers account for the whole of the difference between the estimated and the actual margin (residual 0,00 €, tolerance 166,60 €)
The bridge is computed from the stored snapshot. The next step is always the same: open the line's evidence and check the source rows.
Findings (1)Margin 10 446,39 € · 31,35 %
- Medium mediumMaterial price increaseR33 192,48 €
Quoted items on JOB-0062 exceeded the quote basis: 3 192,48 € above the quote basis.
The job is in order · work centres CNC-1, CNC-2, WELD-1 · version job-margin-rules/2026-09-20.1 · computed 21.09.2026 at 14:48
Evidence (4 rows · Causal reference: 4)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000511 1 14.10.2025 at 21:02 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000512 1 12.10.2025 at 11:11 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000513 1 09.10.2025 at 15:58 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000514 1 15.10.2025 at 21:48 synthetic/v1 In order unitCost