JOB-0025Teräs Energia Oy
Customer CUS-025 · Completed · opened 25.02.2025 at 16:02 · completed 11.03.2025 at 16:02
Work centres: CNC-1, CNC-2, WELD-1
No blocking findings: the margin is reportable.
Quote basis and actual
| Item | Quote basis | Actual |
|---|---|---|
| Revenue (allocated) | 8 624,33 € | 8 624,33 € |
| Material | 3 381,94 € | 3 386,15 € |
| Labour | 32,10 h × 65,34 €/h | 2 092,21 € |
| Subcontract | 329,40 € | 329,40 € |
| Other variable costs | 449,80 € | 449,80 € |
| Margin | — | 2 366,77 € |
The estimated margin is not a stored figure: the quote basis stores the items, and the bridge sets out the difference between estimated and actual line by line.
Snapshot computed 21.09.2026 at 14:48 · definition job-margin/2026-09-20.1 · inputs c43555be719f
The margin bridge
The bridge explains the arithmetic difference: each line says how much of the gap between the estimated and the actual margin that driver accounts for. It does not establish a cause. Why a price or an hours figure moved is a different question, and this view does not answer it.
- 1Revenue differencerevenue_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 2Material quantity differencematerial_quantity_varianceCausal−23,66 €
Evidence (6 rows · Causal reference: 6)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000213 1 11.03.2025 at 09:35 synthetic/v1 In order qty Material consumption material_consumption erp MC-000214 1 28.02.2025 at 05:37 synthetic/v1 In order qty Material consumption material_consumption erp MC-000215 1 27.02.2025 at 17:51 synthetic/v1 In order qty Material consumption material_consumption erp MC-000216 1 10.03.2025 at 10:38 synthetic/v1 In order qty Material consumption material_consumption erp MC-000217 1 04.03.2025 at 19:07 synthetic/v1 In order qty Material consumption material_consumption erp MC-000218 1 08.03.2025 at 05:22 synthetic/v1 In order qty - 3Material price differencematerial_price_varianceCausal+155,71 €
Evidence (6 rows · Causal reference: 6)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000213 1 11.03.2025 at 09:35 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000214 1 28.02.2025 at 05:37 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000215 1 27.02.2025 at 17:51 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000216 1 10.03.2025 at 10:38 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000217 1 04.03.2025 at 19:07 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000218 1 08.03.2025 at 05:22 synthetic/v1 In order unitCost - 4Labour hours differencelabour_hours_varianceCausal+209,74 €
Evidence (14 rows · Causal reference: 14)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-000356 1 26.02.2025 at 11:16 synthetic/v1 In order hours Time entry time_entry timeclock TE-000357 1 28.02.2025 at 21:51 synthetic/v1 In order hours Time entry time_entry timeclock TE-000358 1 07.03.2025 at 21:25 synthetic/v1 In order hours Time entry time_entry timeclock TE-000359 1 11.03.2025 at 07:49 synthetic/v1 In order hours Time entry time_entry timeclock TE-000360 1 28.02.2025 at 03:27 synthetic/v1 In order hours Time entry time_entry timeclock TE-000361 1 06.03.2025 at 03:43 synthetic/v1 In order hours Time entry time_entry timeclock TE-000362 1 06.03.2025 at 19:19 synthetic/v1 In order hours Time entry time_entry timeclock TE-000363 1 07.03.2025 at 11:25 synthetic/v1 In order hours Time entry time_entry timeclock TE-000364 1 02.03.2025 at 21:54 synthetic/v1 In order hours Time entry time_entry timeclock TE-000365 1 07.03.2025 at 04:00 synthetic/v1 In order hours Time entry time_entry timeclock TE-000366 1 10.03.2025 at 11:18 synthetic/v1 In order hours Time entry time_entry timeclock TE-000367 1 11.03.2025 at 03:47 synthetic/v1 In order hours Time entry time_entry timeclock TE-000368 1 28.02.2025 at 23:21 synthetic/v1 In order hours Time entry time_entry timeclock TE-000369 1 02.03.2025 at 22:39 synthetic/v1 In order hours - 5Labour rate differencelabour_rate_varianceCausal−0,03 €
Evidence (14 rows · Causal reference: 14)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-000356 1 26.02.2025 at 11:16 synthetic/v1 In order rate Time entry time_entry timeclock TE-000357 1 28.02.2025 at 21:51 synthetic/v1 In order rate Time entry time_entry timeclock TE-000358 1 07.03.2025 at 21:25 synthetic/v1 In order rate Time entry time_entry timeclock TE-000359 1 11.03.2025 at 07:49 synthetic/v1 In order rate Time entry time_entry timeclock TE-000360 1 28.02.2025 at 03:27 synthetic/v1 In order rate Time entry time_entry timeclock TE-000361 1 06.03.2025 at 03:43 synthetic/v1 In order rate Time entry time_entry timeclock TE-000362 1 06.03.2025 at 19:19 synthetic/v1 In order rate Time entry time_entry timeclock TE-000363 1 07.03.2025 at 11:25 synthetic/v1 In order rate Time entry time_entry timeclock TE-000364 1 02.03.2025 at 21:54 synthetic/v1 In order rate Time entry time_entry timeclock TE-000365 1 07.03.2025 at 04:00 synthetic/v1 In order rate Time entry time_entry timeclock TE-000366 1 10.03.2025 at 11:18 synthetic/v1 In order rate Time entry time_entry timeclock TE-000367 1 11.03.2025 at 03:47 synthetic/v1 In order rate Time entry time_entry timeclock TE-000368 1 28.02.2025 at 23:21 synthetic/v1 In order rate Time entry time_entry timeclock TE-000369 1 02.03.2025 at 22:39 synthetic/v1 In order rate - 6Subcontract differencesubcontract_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 7Rework differencerework_varianceCausal−340,77 €
Evidence (3 rows · Causal reference: 3)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-900005 1 27.02.2025 at 01:00 synthetic/v1 In order — Time entry time_entry timeclock TE-900026 1 05.03.2025 at 14:45 synthetic/v1 In order — Time entry time_entry timeclock TE-900027 1 05.03.2025 at 20:34 synthetic/v1 In order — - 8Other variable cost differenceother_variable_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 9Unexplained differenceresidual_unexplainedNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- ReconcilesJOB-0025 reconciles: the drivers account for the whole of the difference between the estimated and the actual margin (residual 0,00 €, tolerance 50,00 €)
The stored note
tolerance 5000 minor units; tasmaa: JOB-0025 reconciles: the drivers account for the whole of the difference between the estimated and the actual margin (residual 0,00 €, tolerance 50,00 €)
The bridge is computed from the stored snapshot. The next step is always the same: open the line's evidence and check the source rows.
Findings (1)Margin 2 366,77 € · 27,44 %
- Medium mediumReworkR6340,77 €
340,77 € of work on JOB-0025 was done on operations outside the quoted scope.
The job is in order · work centres CNC-1, CNC-2, WELD-1 · version job-margin-rules/2026-09-20.1 · computed 21.09.2026 at 14:48
Evidence (3 rows · Causal reference: 3)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-900005 1 27.02.2025 at 01:00 synthetic/v1 In order — Time entry time_entry timeclock TE-900026 1 05.03.2025 at 14:45 synthetic/v1 In order — Time entry time_entry timeclock TE-900027 1 05.03.2025 at 20:34 synthetic/v1 In order —