JOB-0036Pohjola Telakka Oy
Customer CUS-036 · Completed · opened 10.05.2025 at 09:04 · completed 31.05.2025 at 09:04
Work centres: CNC-1, WELD-1
No blocking findings: the margin is reportable.
Quote basis and actual
| Item | Quote basis | Actual |
|---|---|---|
| Revenue (allocated) | 5 321,73 € | 5 294,06 € |
| Material | 2 254,81 € | 2 111,00 € |
| Labour | 41,21 h × 52,53 €/h | 1 861,66 € |
| Subcontract | 0,00 € | 0,00 € |
| Other variable costs | 0,00 € | 0,00 € |
| Margin | — | 1 321,40 € |
The estimated margin is not a stored figure: the quote basis stores the items, and the bridge sets out the difference between estimated and actual line by line.
Snapshot computed 21.09.2026 at 14:48 · definition job-margin/2026-09-20.1 · inputs 5626768bce2a
The margin bridge
The bridge explains the arithmetic difference: each line says how much of the gap between the estimated and the actual margin that driver accounts for. It does not establish a cause. Why a price or an hours figure moved is a different question, and this view does not answer it.
- 1Revenue differencerevenue_varianceCausal−27,67 €
Evidence (7 rows · Causal reference: 7)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Invoice line invoice_line invoicing IL-000218 1 08.06.2026 at 00:30 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000219 1 24.05.2026 at 02:55 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000220 1 16.05.2026 at 08:48 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000221 1 28.10.2025 at 17:54 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000222 1 12.06.2025 at 22:45 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000223 1 24.07.2026 at 03:45 synthetic/v1 In order — Credit line credit_line invoicing CR-00025 1 24.02.2026 at 06:21 synthetic/v1 In order — - 2Material quantity differencematerial_quantity_varianceCausal+60,57 €
Evidence (8 rows · Causal reference: 8)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000302 1 25.05.2025 at 22:43 synthetic/v1 In order qty Material consumption material_consumption erp MC-000303 1 17.05.2025 at 23:24 synthetic/v1 In order qty Material consumption material_consumption erp MC-000304 1 12.05.2025 at 13:30 synthetic/v1 In order qty Material consumption material_consumption erp MC-000305 1 29.05.2025 at 19:28 synthetic/v1 In order qty Material consumption material_consumption erp MC-000306 1 29.05.2025 at 17:41 synthetic/v1 In order qty Material consumption material_consumption erp MC-000307 1 31.05.2025 at 02:49 synthetic/v1 In order qty Material consumption material_consumption erp MC-000308 1 24.05.2025 at 09:52 synthetic/v1 In order qty Material consumption material_consumption erp MC-000309 1 18.05.2025 at 22:07 synthetic/v1 In order qty - 3Material price differencematerial_price_varianceCausal+83,24 €
Evidence (8 rows · Causal reference: 8)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000302 1 25.05.2025 at 22:43 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000303 1 17.05.2025 at 23:24 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000304 1 12.05.2025 at 13:30 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000305 1 29.05.2025 at 19:28 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000306 1 29.05.2025 at 17:41 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000307 1 31.05.2025 at 02:49 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000308 1 24.05.2025 at 09:52 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000309 1 18.05.2025 at 22:07 synthetic/v1 In order unitCost - 4Labour hours differencelabour_hours_varianceCausal+303,10 €
Evidence (13 rows · Causal reference: 13)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-000525 1 19.05.2025 at 16:31 synthetic/v1 In order hours Time entry time_entry timeclock TE-000526 1 28.05.2025 at 22:38 synthetic/v1 In order hours Time entry time_entry timeclock TE-000527 1 17.05.2025 at 17:12 synthetic/v1 In order hours Time entry time_entry timeclock TE-000528 1 22.05.2025 at 06:49 synthetic/v1 In order hours Time entry time_entry timeclock TE-000529 1 23.05.2025 at 00:30 synthetic/v1 In order hours Time entry time_entry timeclock TE-000530 1 21.05.2025 at 12:37 synthetic/v1 In order hours Time entry time_entry timeclock TE-000531 1 26.05.2025 at 02:11 synthetic/v1 In order hours Time entry time_entry timeclock TE-000532 1 25.05.2025 at 12:47 synthetic/v1 In order hours Time entry time_entry timeclock TE-000533 1 18.05.2025 at 02:32 synthetic/v1 In order hours Time entry time_entry timeclock TE-000534 1 20.05.2025 at 17:44 synthetic/v1 In order hours Time entry time_entry timeclock TE-000535 1 15.05.2025 at 04:49 synthetic/v1 In order hours Time entry time_entry timeclock TE-000536 1 14.05.2025 at 13:01 synthetic/v1 In order hours Time entry time_entry timeclock TE-000537 1 17.05.2025 at 14:04 synthetic/v1 In order hours - 5Labour rate differencelabour_rate_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 6Subcontract differencesubcontract_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 7Rework differencerework_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 8Other variable cost differenceother_variable_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 9Unexplained differenceresidual_unexplainedNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- ReconcilesJOB-0036 reconciles: the drivers account for the whole of the difference between the estimated and the actual margin (residual 0,00 €, tolerance 50,00 €)
The stored note
tolerance 5000 minor units; tasmaa: JOB-0036 reconciles: the drivers account for the whole of the difference between the estimated and the actual margin (residual 0,00 €, tolerance 50,00 €)
The bridge is computed from the stored snapshot. The next step is always the same: open the line's evidence and check the source rows.
Findings (1)Margin 1 321,40 € · 24,96 %
- Medium mediumUnallocated creditR7142,62 €
142,62 € of credits carry no job allocation, so no job's revenue is reduced by them.
The job is in order · work centres CNC-1, WELD-1 · version job-margin-rules/2026-09-20.1 · computed 21.09.2026 at 14:48
Evidence (1 rows · Causal reference: 1)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Credit line credit_line invoicing CR-900000 1 12.06.2026 at 19:44 synthetic/v1 In order jobId