JOB-0066Pohjola Energia Oy
Customer CUS-026 · Completed · opened 12.11.2025 at 19:04 · completed 10.12.2025 at 19:04
Work centres: CNC-1, CNC-2, WELD-1
No blocking findings: the margin is reportable.
Quote basis and actual
| Item | Quote basis | Actual |
|---|---|---|
| Revenue (allocated) | 6 168,48 € | 6 103,30 € |
| Material | 3 406,25 € | 3 273,91 € |
| Labour | 28,61 h × 47,74 €/h | 1 215,47 € |
| Subcontract | 0,00 € | 0,00 € |
| Other variable costs | 0,00 € | 0,00 € |
| Margin | — | 1 613,92 € |
The estimated margin is not a stored figure: the quote basis stores the items, and the bridge sets out the difference between estimated and actual line by line.
Snapshot computed 21.09.2026 at 14:48 · definition job-margin/2026-09-20.1 · inputs 747cc2ce4704
The margin bridge
The bridge explains the arithmetic difference: each line says how much of the gap between the estimated and the actual margin that driver accounts for. It does not establish a cause. Why a price or an hours figure moved is a different question, and this view does not answer it.
- 1Revenue differencerevenue_varianceCausal−65,18 €
Evidence (8 rows · Causal reference: 8)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Invoice line invoice_line invoicing IL-000401 1 08.06.2026 at 17:14 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000402 1 10.01.2026 at 10:34 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000403 1 29.01.2026 at 02:33 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000404 1 29.03.2026 at 04:00 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000405 1 22.02.2026 at 00:14 synthetic/v1 In order — Invoice line invoice_line invoicing IL-000406 1 25.04.2026 at 23:41 synthetic/v1 In order — Invoice line invoice_line invoicing IL-900000 1 24.04.2026 at 10:22 synthetic/v1 In order — Credit line credit_line invoicing CR-00053 1 16.06.2026 at 02:03 synthetic/v1 In order — - 2Material quantity differencematerial_quantity_varianceCausal+94,89 €
Evidence (10 rows · Causal reference: 10)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000537 1 01.12.2025 at 19:00 synthetic/v1 In order qty Material consumption material_consumption erp MC-000538 1 03.12.2025 at 23:01 synthetic/v1 In order qty Material consumption material_consumption erp MC-000539 1 13.11.2025 at 04:51 synthetic/v1 In order qty Material consumption material_consumption erp MC-000540 1 29.11.2025 at 22:19 synthetic/v1 In order qty Material consumption material_consumption erp MC-000541 1 29.11.2025 at 01:30 synthetic/v1 In order qty Material consumption material_consumption erp MC-000542 1 02.12.2025 at 20:37 synthetic/v1 In order qty Material consumption material_consumption erp MC-000543 1 27.11.2025 at 22:40 synthetic/v1 In order qty Material consumption material_consumption erp MC-000544 1 02.12.2025 at 10:43 synthetic/v1 In order qty Material consumption material_consumption erp MC-000545 1 02.12.2025 at 21:29 synthetic/v1 In order qty Material consumption material_consumption erp MC-000546 1 24.11.2025 at 23:17 synthetic/v1 In order qty - 3Material price differencematerial_price_varianceCausal+37,44 €
Evidence (10 rows · Causal reference: 10)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000537 1 01.12.2025 at 19:00 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000538 1 03.12.2025 at 23:01 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000539 1 13.11.2025 at 04:51 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000540 1 29.11.2025 at 22:19 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000541 1 29.11.2025 at 01:30 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000542 1 02.12.2025 at 20:37 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000543 1 27.11.2025 at 22:40 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000544 1 02.12.2025 at 10:43 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000545 1 02.12.2025 at 21:29 synthetic/v1 In order unitCost Material consumption material_consumption erp MC-000546 1 24.11.2025 at 23:17 synthetic/v1 In order unitCost - 4Labour hours differencelabour_hours_varianceCausal+150,38 €
Evidence (12 rows · Causal reference: 12)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-000973 1 18.11.2025 at 18:33 synthetic/v1 In order hours Time entry time_entry timeclock TE-000974 1 30.11.2025 at 14:47 synthetic/v1 In order hours Time entry time_entry timeclock TE-000975 1 01.12.2025 at 23:18 synthetic/v1 In order hours Time entry time_entry timeclock TE-000976 1 16.11.2025 at 08:58 synthetic/v1 In order hours Time entry time_entry timeclock TE-000977 1 30.11.2025 at 06:09 synthetic/v1 In order hours Time entry time_entry timeclock TE-000978 1 08.12.2025 at 21:47 synthetic/v1 In order hours Time entry time_entry timeclock TE-000979 1 07.12.2025 at 12:21 synthetic/v1 In order hours Time entry time_entry timeclock TE-000980 1 13.11.2025 at 23:06 synthetic/v1 In order hours Time entry time_entry timeclock TE-000981 1 12.11.2025 at 22:56 synthetic/v1 In order hours Time entry time_entry timeclock TE-000982 1 09.12.2025 at 05:45 synthetic/v1 In order hours Time entry time_entry timeclock TE-000983 1 04.12.2025 at 01:53 synthetic/v1 In order hours Time entry time_entry timeclock TE-000984 1 18.11.2025 at 13:47 synthetic/v1 In order hours - 5Labour rate differencelabour_rate_varianceCausal−0,01 €
Evidence (12 rows · Causal reference: 12)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Time entry time_entry timeclock TE-000973 1 18.11.2025 at 18:33 synthetic/v1 In order rate Time entry time_entry timeclock TE-000974 1 30.11.2025 at 14:47 synthetic/v1 In order rate Time entry time_entry timeclock TE-000975 1 01.12.2025 at 23:18 synthetic/v1 In order rate Time entry time_entry timeclock TE-000976 1 16.11.2025 at 08:58 synthetic/v1 In order rate Time entry time_entry timeclock TE-000977 1 30.11.2025 at 06:09 synthetic/v1 In order rate Time entry time_entry timeclock TE-000978 1 08.12.2025 at 21:47 synthetic/v1 In order rate Time entry time_entry timeclock TE-000979 1 07.12.2025 at 12:21 synthetic/v1 In order rate Time entry time_entry timeclock TE-000980 1 13.11.2025 at 23:06 synthetic/v1 In order rate Time entry time_entry timeclock TE-000981 1 12.11.2025 at 22:56 synthetic/v1 In order rate Time entry time_entry timeclock TE-000982 1 09.12.2025 at 05:45 synthetic/v1 In order rate Time entry time_entry timeclock TE-000983 1 04.12.2025 at 01:53 synthetic/v1 In order rate Time entry time_entry timeclock TE-000984 1 18.11.2025 at 13:47 synthetic/v1 In order rate - 6Subcontract differencesubcontract_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 7Rework differencerework_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 8Other variable cost differenceother_variable_varianceNo claim0,00 €
No claim A zero line points at no source rows: it claims nothing, so no evidence is to be expected.
- 9Unexplained differenceresidual_unexplainedCausal+0,01 €
Evidence (22 rows · Causal reference: 22)
Causal referenceThe rows that produced the amountThese rows produced the amount: every figure is computed from these rows.
Table Source Row Version Time (UTC) Mapping Quality Field Material consumption material_consumption erp MC-000537 1 01.12.2025 at 19:00 synthetic/v1 In order — Material consumption material_consumption erp MC-000538 1 03.12.2025 at 23:01 synthetic/v1 In order — Material consumption material_consumption erp MC-000539 1 13.11.2025 at 04:51 synthetic/v1 In order — Material consumption material_consumption erp MC-000540 1 29.11.2025 at 22:19 synthetic/v1 In order — Material consumption material_consumption erp MC-000541 1 29.11.2025 at 01:30 synthetic/v1 In order — Material consumption material_consumption erp MC-000542 1 02.12.2025 at 20:37 synthetic/v1 In order — Material consumption material_consumption erp MC-000543 1 27.11.2025 at 22:40 synthetic/v1 In order — Material consumption material_consumption erp MC-000544 1 02.12.2025 at 10:43 synthetic/v1 In order — Material consumption material_consumption erp MC-000545 1 02.12.2025 at 21:29 synthetic/v1 In order — Material consumption material_consumption erp MC-000546 1 24.11.2025 at 23:17 synthetic/v1 In order — Time entry time_entry timeclock TE-000973 1 18.11.2025 at 18:33 synthetic/v1 In order — Time entry time_entry timeclock TE-000974 1 30.11.2025 at 14:47 synthetic/v1 In order — Time entry time_entry timeclock TE-000975 1 01.12.2025 at 23:18 synthetic/v1 In order — Time entry time_entry timeclock TE-000976 1 16.11.2025 at 08:58 synthetic/v1 In order — Time entry time_entry timeclock TE-000977 1 30.11.2025 at 06:09 synthetic/v1 In order — Time entry time_entry timeclock TE-000978 1 08.12.2025 at 21:47 synthetic/v1 In order — Time entry time_entry timeclock TE-000979 1 07.12.2025 at 12:21 synthetic/v1 In order — Time entry time_entry timeclock TE-000980 1 13.11.2025 at 23:06 synthetic/v1 In order — Time entry time_entry timeclock TE-000981 1 12.11.2025 at 22:56 synthetic/v1 In order — Time entry time_entry timeclock TE-000982 1 09.12.2025 at 05:45 synthetic/v1 In order — Time entry time_entry timeclock TE-000983 1 04.12.2025 at 01:53 synthetic/v1 In order — Time entry time_entry timeclock TE-000984 1 18.11.2025 at 13:47 synthetic/v1 In order —
- Rounding difference0,01 € of the difference between the estimated and the actual margin of JOB-0066 is inside the 0,04 € the source data's own rounding accounts for: a rounding difference, not an amount no driver can place (tolerance 50,00 €)
The stored note
tolerance 5000 minor units; pyoeristysero: 0,01 € of the difference between the estimated and the actual margin of JOB-0066 is inside the 0,04 € the source data's own rounding accounts for: a rounding difference, not an amount no driver can place (tolerance 50,00 €)
The bridge is computed from the stored snapshot. The next step is always the same: open the line's evidence and check the source rows.
Findings (0)Margin 1 613,92 € · 26,44 %
None of v0's nine rules fired for this job. That is not the same as there being nothing to look at — it means that no finding was detected on these rows.